Tue09012015

Last updateWed, 27 Dec 2017 12am

YMCA’s Bright Beginnings helps kids start school year right

YMCA’s Bright Beginnings helps kids start school year right

The King George YMCA held its annual Bright Beginnings event last week to help dozens of deserving k...

King George AM Bus Routes - 2015-2016

King George AM Bus Routes - 2015-2016

KG holds 5th Annual National Night Out

KG holds 5th Annual National Night Out

The King George Sheriff’s department hosted its fifth annual ‘Night Out’ against c...

VDOE seeking input from parents on school performance ‘report cards’

The Virginia Department of Education is asking parents and other members of the public what changes ...

Summer holiday winding down for King George students

The lazy days of summer continue all the way through August for most, but not this year for students...

Boyd takes reins as principal at King George High School

Boyd takes reins as principal at King George High School

Jesse Boyd has been named as the new principal of King George High School.
The school board approved...

 

eyecareofva201403 web

 

 

 

 

  Muhammad 900x120 Banner2015

Banner printing Comm Dental

KGHS access road under construction

Road is for pedestrians and emergency vehicles

The King George School Board received a recent status report on a project under construction for an access road between King George High School and King George Middle School.


The report was by project manager Dave Barlow from CHA, Inc., who provided details at a School Board meeting on Oct. 10.

PURPOSE
Barlow explained the purpose of the road, saying it was designed for pedestrian traffic for those who use overflow parking for sporting and other events held at the high school.
It will also accommodate emergency vehicles, in the event it is needed. 
“Parking is always an issue at a stadium, and there are a number of spaces at the middle school which would really be unused,” Barlow said. “So the thinking was that the parking at the middle school could really be overflow, and we’d provide a safe path for someone to get from the parking lot to the high school.”
Barlow said the route of the access road will go from the back corner of the high school parking lot, and run in between the tennis courts and a storm water management pond. Near the corner of the former vocational building, the road will tie into the existing gravel service road that runs to the track.
Barlow said the road will be about 400 feet long and will total about 20 feet wide. That includes a 12-foot width of asphalt pavement with gravel shoulders. The primary purpose is intended for pedestrians, although Barlow said it is sized, both width-wise and structurally, so a service vehicle can drive through.
Under the contract, two steel-filled concrete bollards will be installed with a locked chain at the end of the road nearest the middle school.
Those are designed to restrict access by vehicle traffic. Barlow said he expected it to have a breakaway chain in the event of an emergency and an emergency vehicle had to get through to one or the other to the two schools.
He noted that alternate routes were considered. Barlow said there is not enough school property to have routed the road in front of the tennis courts, and they did not want it to run it between the tennis courts and vocational building.
He said the county intends to also have pedestrian lights installed under its municipal agreement with Dominion Power. 
The access road was originally intended to be bid as part of the high school contract, but Travis Quesenberry, county administrator suggested it be bid separately to save money, which happened, since it came in considerably under the $90,000 budgeted.
The Board of Supervisors approved a construction bid of $54,000 to DeBernard Construction on Aug. 21. The contract calls for substantial completion to be achieved in 75 days, with another 30 days to achieve final completion. The Notice to Proceed was issued by the county on Sept. 25. 

Phyllis Cook

 

NARFE WEB2 150x300

Contact Lori Deem

This email address is being protected from spambots. You need JavaScript enabled to view it.

540-709-7495 • 540-775-2024


 

Quikey

Bulletline


 

Balloon House


 link4

Wedding invitations and other announcements

 

201508source

2015health
2015montross 2015cbguide

 

201504getaway

 

201505pr

201505homesection

201506family

2015montross

20150624grad

Contact Us

The Journal Press, Inc. P. O. Box 409, 10250 Kings Hwy. King George, VA 22485

EDITORIAL
George Whitehurst
540-775-2024 Main
This email address is being protected from spambots. You need JavaScript enabled to view it.
This email address is being protected from spambots. You need JavaScript enabled to view it.

REPORTING
Leonard Banks
540-469-4196
This email address is being protected from spambots. You need JavaScript enabled to view it.

Phyllis Cook
This email address is being protected from spambots. You need JavaScript enabled to view it.

Linda Farneth
This email address is being protected from spambots. You need JavaScript enabled to view it.

Richard Leggitt
540-993-7460
This email address is being protected from spambots. You need JavaScript enabled to view it.

GRAPHICS
Leonard Banks
540-469-4196
This email address is being protected from spambots. You need JavaScript enabled to view it.

ADVERTISING
This email address is being protected from spambots. You need JavaScript enabled to view it.

ADVERTISING SALES
DeAnte Bryant
540-709-7061
This email address is being protected from spambots. You need JavaScript enabled to view it.

Dennis Verdak
540-709-7076
This email address is being protected from spambots. You need JavaScript enabled to view it.

COMMERCIAL PRINTING & SALES
Lori Deem, Print Shop
540-709-7495
This email address is being protected from spambots. You need JavaScript enabled to view it.

COMMUNITY &
CHURCH EVENTS

Lori Deem
540-709-7495
This email address is being protected from spambots. You need JavaScript enabled to view it.

OFFICE
Jessica Herrink
540-775-2024 (main)
540-469-4031
This email address is being protected from spambots. You need JavaScript enabled to view it.

Robert Berczuk
540-775-2024
This email address is being protected from spambots. You need JavaScript enabled to view it.

PRODUCTION/IS

Drue Murray
540-709-7288
This email address is being protected from spambots. You need JavaScript enabled to view it.

SUBSCRIPTIONS
Bonnie Gouvisis
540-775-2024
This email address is being protected from spambots. You need JavaScript enabled to view it.

PUBLIC NOTICES
& LEGALS

Lori Deem
540-709-7495
This email address is being protected from spambots. You need JavaScript enabled to view it.